Danang Administration Center

Project data

Location: Hai Chau district, Da Nang city, Vietnam

  • Height: 166.8 m
  • Storeys: 34 floors and 2 basements
  • Total floor area: 65,234 m2
  • Highlight: above the ground-floor section, the 34 storeys feature sawtooth-shaped floor plan cross-sections which go round a central reinforced concrete core that features varying diameters between 33m and 43m. As a result, the glass facade winds its way upwards like a spiral.
  • Construction status: finished in 2013

Requirements

  • Architectural concrete requirements 
  • Tight construction schedule

Customer

  • Contractor: TAKCO - Tan Ky Co.
  • Field Service: PERI Asia PTE LTD.

Customer's benefit

  • Construction completed on schedule with high dimensional accuracy and perfect architectural concrete results.
Mr Tran Van Tuan
General Director

The support and consultancy of PERI in engineering, logistics and on-site instruction were provided and received with much enthusiasm. We wish to continue the successful co-operation between TAKCO and PERI in the Vietnam market.

PERI solution

  • Efficient ST100 shoring system solution, adapted to site requirements
  • VARIO GT 24 Wall Formwork together with the CB 240 and CB 160  is used for the casting of lift core and stairs
  • Easy assemblied MULTIPROP slab table was used for complicated construction shapes