Rao Bridge 2

Project data

Location: Hai Phong City, Vietnam

  • It links the centre of Hai Phong city with the Do Son tourist area and the coastal districts of Duong Kinh and Kien Thuy.
  • It features a span of 240m with one pylon carrying the main span of 120m and the nearest side span of 70m. 
  • It has 4 lanes and pavements in each direction. 
  • Construction status: finished in 2012

Requirements

  • High logistical requirements
  • High quality requirements on concrete finish and dimensional accuracy
  • Consideration of high wind speeds
  • Variable dimensions of the pylon legs

Customer

  • Main contractor: MT HOJGAARD Co.
  • Field Service: PERI Denmark

Customer's benefit

  • Saving on crane capacities and working time
  • Safe formwork at the site

PERI solution

  • Efficient formwork concept with self-climbing formwork ACS and VARIO GT 24
  • The MULTIFLEX slabs for reinforced concrete