Mong Duong Thermal Power Plant 1

Project data

Location: Mong Duong district, Quang Ninh province, Vietnam

  • Including two items with the capacity of 1,080 MW 
  • Construction area: 55 ha
  • Construction status: finished in 2013

Requirements

  • Different construction element shapes with thick and straight walls 
  • Tight construction schedule

Customer

  • Main contractor: HYUNDAI E&C
  • Field Service: PERI Korea

Customer's benefit

  • Execution in short construction time
  • Saving labor costs

PERI solution

  • The VARIO GT 24 column and CB climbing scaffold for an economical climbing formwork solution
  • Combination of the ST 100 shoring system and MULTIFLEX slabs for reinforced concrete