Thai Binh Thermal Power Plant 1

Project data

Location: Thai Thuy district, Thai Binh province, Vietnam

  • Including two items with the total capacity of 600 MW
  • Construction area: 115 ha
  • Construction status: in progress

Requirements

  • Strictly safe requirement
  • Tight construction schedule
  • Flexible application in forming different construction elements

Customer

  • Main contractor: MARUBENI Corp.
  • Sub-contractor 1: TOA Corp.
  • Sub-contractor 2: BACH DANG Co.
  • PERI Customer: NIKKEN Vietnam
  • Field Service: PERI Asia PTE LTD.

Customer's benefit

  • Safe formwork at the site
  • Saving labor costs
  • Multi-using times of formwork system
Vu Thanh Nam
Deputy Project Director of Bach Dang JSC.

It was a flexible formwork system and fit to every application with the simple assemblability.Our workers can use the products smoothly after a short training time. Due to fast assembling time and simple working process with crane, it helped us shorten down the schedule in a half in comparison with the conventional formworks. Accordingly, we can reduce the labor-cost as well as ensure their health during working.The professional engineers of PERI also provided us much support during the construction.

PERI solution

  • The VARIO GT 24 column formwork was used for columns 3.5 x 3.5 x 6.9 m
  • The MULTIFLEX slab tables for top-deck with the dimensions of 40 x 12 x 2.5-3.5 m