Quang Binh Plant for sorting, disposing waste, producing biogas & organic mineral fertilizer

Project data

Location: Quang Binh province, Vietnam

  • The pant was designed and built with the purpose of sorting, disposing waste, producing biogas & organic mineral fertilizer.
  • Its nominal capacity is 300 tons/day for the waste classification; 1MW of biogas and electricity; and 5,000 tons/ year of the organic mineral fertilizers.
  • Construction status: in progress

Requirements

  • high safety and dimensional accuracy requirements
  • tight construction schedule
  • casting height of up to 8m

Customer

  • Contractor: VINACONEX E&C – INPUT Ingenieure GmbH
  • Supplied by: PERI Asia Pte Ltd. (Vietnam Rep. Office)

Customer's benefit

  • Ensure the dimensional accuracy of the finished concrete
  • Safe formwork at the site
  • Catch up project schedule
  • Saving labor costs
  • Multi-using times of formwork system
Mr. Nguyen Xuan Tung
Site Manager

PERI products are very good, and the support for designing and solving incurred problems was very fast and well-cooperated. Though it was really a difficult challenge to assure the quality of the finished concrete surface with the up to 8 m wall-height at one time, but we still achieved a good result, and satisfied the Investors and Consultants of the project thanks to the stability of PERI formwork system.

PERI solution

  • Efficient and cost-effective concept with VARIO GT24 wall formwork for the casting height up to 8m per time