Nam Ngiep Hydro Power Plant 1

Project data

Location: Bolikhamxay and Xaysomboun provinces, Laos

  • Including two dams and power stations with the main dam's height of 148 m and the total capacity of 290 MW
  • Construction status: in progress

Requirements

  • Transfer of high loads with 1m of concrete thick, in height of 30 m 
  • Tight construction schedule
  • High safety requirement

Customer

  • Main contractor: OBAYASHI Corp.
  • Sub-contractor: SONG DA 5 Co.
  • Field Service: PERI Asia PTE LTD.

Customer's benefit

  • Execution in short construction time
  • Saving labor costs

 

Pham Van Bac
Site Engineer (Song Da 5 Co.)

The PERI VARIO GT 24 wall formwork and ST 100 shoring system already met the current requirements of the project. These systems were safe for using, worked well under every environment and weather conditions. The simple assembly as well as dismantling of the systems not only reduced the labor requirement and increased the productivity at site. But it also helped the delivery to the remote locations. Besides that, the continued technical support from PERI team was very helpful during the concreting time. PERI has provided us the professional services and the high-quality products.

PERI solution

  • Combination of the VARIO GT 24 wall and CB climbing scaffold for an economical formwork solution supporting height of 29 m and wall-thickness of 2 - 2.5 m 
  • The ST 100 shoring system for reinforced concrete
  • PERI Birch panels for a good concrete surface and many re-useable times