New construction of a hotel with 5 basement levels and 20 upper storeys
Total height: 87 m
Construction time: January 2013 to the end of 2014
Architect: Claude Vasconi
Self-climbing formwork for complex geometries and a wide range of loads
- assembly support for the precast parapets
- for accommodating loads from steel formwork provided by the contractor
- circumferential climbing protection panel for complete, closed enclosure
Integration of a landing platform for the transport of materials
Bateg / CBC, Velizy - Villacoublay, France
The Hotel Meliá itself is a real technical challenge whilst the site surroundings also provide severe restrictions. The PERI climbing formwork solution, based on the RCS system, fully meets our requirements - both in terms of safety as well as use.