-
Agile and adaptable
with only 2 frame heights and large spindle extensions
-
High load-bearing capacity
with up to 73 kN leg load and for large slab heights
-
Large units easily moved
horizontally with a Trolley and Winch, and vertically using the Lifting Fork
Applications
-
With the frame heights R 150 and R 110, as well as the large spindle lengths, each height is continuously adjustable up to the maximum.
-
The PERI PD 8 slab table and shoring tower are type-tested and ideal for us on building projects or infrastructure construction with large heights and high loads
-
10.50m high PD 8 slab tables with SRZ steel walers as main beams and VT 20 as cross beams for construction of a warehouse.
-
Cost-effective use of the PD 8 for construction of a motorway bridge.
-
Complicated PD 8 falsework with inclined concrete surfaces for constructing a shopping centre.
-
PD 8 slab tables with 2 x GT 24 main beams and GT 24 cross beams.
-
Optimal height adjustment with PD 8 frames R 150 and R 110 for a bridge superstructure.
-
PD 8 slab tables moved with the Lifting Fork 1.75 t / 8.0 m.
-
With the PD 8 Lifting Unit, the slab tables are moved with the crane.
Interested in using PD 8 Shoring System for your project?
Contact us – we will be happy to help you.